Tribe- I need some help deciding on my runway at my house.
Option 1 gives me 1200 ft. running North/South and a pretty good grade which will help to slow me when landing North and speed me up when taking off to the South. There is 1700 feet between the trees. The North end is about 30 feet higher than the south end. Minimal grading is required- mainly just smoothing some terraces that are about 16" deep. I would not own the upper 250 ft. but do have permission to use it and have 1st option to buy if it ever comes for sale.
Option 2 gives me 1600 ft. running East/ West fairly level except the last 200 feet on the west end which is about 15-20 feet higher. Takeoffs would be to the east most of the time and landings to the west. Distance between the trees is 2100 and my approach is very protected as our family owns the land for 1/2 mile. ALOT of grading/ clearing would be required as would the movement of my pond. With this option I would probably have to buy a dozer and take a year or so of spare time to get it right.
Which would you do. I want to get started this spring. Here is the link to the photo showing the potential runways.
Option 1 gives me 1200 ft. running North/South and a pretty good grade which will help to slow me when landing North and speed me up when taking off to the South. There is 1700 feet between the trees. The North end is about 30 feet higher than the south end. Minimal grading is required- mainly just smoothing some terraces that are about 16" deep. I would not own the upper 250 ft. but do have permission to use it and have 1st option to buy if it ever comes for sale.
Option 2 gives me 1600 ft. running East/ West fairly level except the last 200 feet on the west end which is about 15-20 feet higher. Takeoffs would be to the east most of the time and landings to the west. Distance between the trees is 2100 and my approach is very protected as our family owns the land for 1/2 mile. ALOT of grading/ clearing would be required as would the movement of my pond. With this option I would probably have to buy a dozer and take a year or so of spare time to get it right.
Which would you do. I want to get started this spring. Here is the link to the photo showing the potential runways.
Comment